Technical Data of GEMAK Company

Please find below some technical data about Gemak Company according to several End-Works completed in Turkey.

 

-In city Tokat, Gemak Company successfully completed;

1.  455.290 metres of 34,5 kV HV underground energy cable
2.  83.807 metres of 1 kV LV underground energy cable
3.  1235 unit Lightinging Poles
4.  55 substation within the range of 100 kVA -e 1000 kVA , 34.5/0.4 kV.

 

-In city Sivas , Gemak Company successfully completed ;

1.  322.577 metres of 34,5 kV HV underground energy cable
2.  245.855 metres of 1 kV LV underground energy cable
3.  2233 unit Lightinging Poles
4.  75 substation within the range of 100 kVA – 1250 kVA , 34.5/0.4 kV

 

-In city Antalya , Gemak Company successfully completed ;

1.  595.973 metre 34,5 kV HV underground energy cable
2.  343.467 metre 1 kV LV underground energy cable
3.  2517 unit Lightinging Poles
4.  144 substation within the range 100 kVA – 2500 kVA, 34,5/0,4 kV

 

-Transmission Lines done in several cities by km ;

1. Kırşehir : 180 Km.
2. Kaman – Hirfanlı : 86 Km.
3. Kalaba – Kozaklı : 38 Km.
4. Nevşehir – Derinkuyu : 246 Km.
5. Aydın TM- Çine DM : 142 Km.

 

-In Iraq and Afghanistan Diesel Power Generation Solutions completed by Gemak Company (on
EPC base, 7*24 maintanance)

1. GENSET from 100kVA to 2500kVA.
2. UPS from 600VA to 6.4MVA ,
3. Load Bank from 1 kW to 50 MW at low or high voltage